Portfolio

New Installations

Here is the installation of a new Goodman 96% 2 stage gas furnace with a 16 SEER a/c at a office building renovation. This included a new zoned duct system for the first and second floors, condenser is located on the roof.

System Upgrades

Here are some before and after pictures of a hot water heating system install. The old oil fired boiler was converted to a Buderus gas fired boiler, taco zone valves/ zone control was added to zone system. Aquasmart boiler control adjusts high limit as needed to save fuel.